ICRI 310.2R: Concrete Surface Profiles (CSP 1–10)

ICRI’s guideline and its ten rubber CSP chips give everyone on a concrete job a shared language for how rough a surface must be before coating.

BodyICRI
ScaleCSP 1 (smoothest) to CSP 10
ToolPhysical CSP replica chips

What CSP means

Concrete Surface Profile (CSP) describes the texture left by preparation, from the near-smooth result of acid etching (CSP 1) to the heavily fractured surface left by a concrete breaker and blast (CSP 10). ICRI sells molded replica chips so applicators and inspectors can compare the actual floor to an agreed reference.

Typical methods by profile

CSPTypical preparation methods
1–2Acid etching, grinding
3–4Light shotblasting, light scarifying
5–6Medium shotblasting, scarifying
7Heavy abrasive blasting
8–9Scabbling, heavy scarification
10Handheld concrete breaker followed by abrasive blasting

Matching profile to system

Thin penetrating sealers need only light profiles, while high-build coatings, broadcast floors and polymer overlays need progressively rougher ones to gain mechanical bond. Always use the CSP range on the coating manufacturer’s data sheet, and confirm bond with pull-off testing (ASTM D7234).

Acid etching cautionAcid etching is often discouraged for high-performance coatings because residues and weak laitance can remain. Mechanical methods are generally preferred.